Dear Kensington Residents:

The Washington Suburban Sanitary Commission (WSSC) is currently in design phase to replace four (4) miles of water mains within the Town. The scope of this project (Warner Circle WMR) encompasses Town streets located south of the CSX railroad, east of Summit Avenue, and west of Kensington Parkway.

As part of the design phase, WSSC will need to conduct subsurface investigations—including soil borings, pavement cores, and test pits—to confirm existing underground utilities.

The subsurface investigations will begin the week of August 10, 2026 and all test locations should be completed by early September. There are 40 separate test locations and the work will take place Monday through Friday, between 9:00 am and 3:00 pm. Each individual site will be restored once it has been investigated.

Once the design phase has been completed, the Town anticipates the main repairs to begin summer 2027 and will provide additional information to the community.

You may view a map of the boring and test pit locations here.

Please contact Town staff with any questions at [email protected] or 301-949-2424.